作业帮 > 英语 > 作业

英语翻译Products details confirmed on Dec.9th.,and the delivery

来源:学生作业帮 编辑:灵鹊做题网作业帮 分类:英语作业 时间:2024/06/16 20:44:11
英语翻译
Products details confirmed on Dec.9th.,and the delivery date will be postponed for 9 days according to the original date,while there still some days for production.Besides,we need to change the drawings according to your requirement,and the final delivery date will be postponed,postponed days will be based upon the date of signature of the confirmation of the drawings.Thank you!
因产品细节确认为12月9日,故交货期按照合同上的交货期顺延9天,另现按照贵司要求图纸要进行修改,故最终交货期还要顺延,顺延天数根据最新签字确认图纸的日期确定.
您好 我需要的是检查中译英的问题!看英语是否翻译得当
英语翻译Products details confirmed on Dec.9th.,and the delivery
perfect!
产品的细节于12月9日确认原因是生产还需要一些时日 while引导的丛句在填译上去就如虎添翼了.